Pier H, Fire Station No. 6

Client

Adams/Mallory Construction 


Architect

Port of Long Beach 

Budget 

$306,000 


Size 

3,000 SF 

Project Description

Constructed to service the Queen Mary tourist complex and adjacent Port of Long Beach docks, this essential facility features an increased structural design to account for potential seismic activity. With full height, brick wall panels 8 to 10 feet in width, this Butler metal building utilizes a CMR-24 standing seam roof system with rigid board insulation, liner panel and interior flat Stylwall panels. All flashings for the building were hand crafted at the job site.